Skip to content
[email protected]1-970-203-4517
Linkedin page opens in new window
DBP Electrical Consulting
DBP Electrical ConsultingDBP Electrical Consulting
CONTACT US
Search:
  • Home
  • About Us
    • Contact Us
  • Electrical Estimating Services
  • Electrical Estimator Training
  • Contractor Development
  • Blogs
  • Home
  • About Us
    • Contact Us
  • Electrical Estimating Services
  • Electrical Estimator Training
  • Contractor Development
  • Blogs

Daily Archives: May 11, 2013

You are here:
  1. Home
  2. 2013
  3. May
  4. 11

DBP Electrical Consulting Participates in a VE Study for the Chicago Sanitary and Ship Canal

ramblingsBy David PardenMay 11, 2013

In April of 2013 DBP Electrical Consulting was invited to participate by Value Management Stratigies to a VE study in Chicago for the U.S Army Corps of Engineer’s electric barrier system IIA and IIB on the Chicago Sanitary and Ship Canal. The barrier was developed to keep Asian Carp from reaching the Great Lakes via the…

Web Design by Pensacola Web Designs

Copyright 2023 | DBP Electrical Consulting, LLC

Go to Top